Training & Advantag

Home / Training & Advantag
Building-block installation

Enterprises in the integrated bathroom industry that manufacture high-quality integrated bathrooms

Read More
Support services we can provide

Integrated bathroom, integrated bathroom, hotel restroom, integrated shower room, integrated toilet, integrated bathroom.

  • Step 1: Make an appointment for sales and cooperate with the instructions

    Introduce the overall product advantages and features. Please ask users to do a good job in positioning the specifications, dimensions and grades.

  • Step 2: Design the contract signing and installation cycle

    Sign the sales contract, ask the user to modify the layout of water, electricity and gas pipelines, confirm the signed design plan, and reasonably commit to the installation period.

  • Step 3: Data handover and production arrangement plan

    The confirmed order information is complete. Please submit the information to the customer service department within one week, and the order follower will monitor the production process of the order.

  • Step 4: Re-testing and on-site re-examination

    On-site re-measurement for complex projects, accurate measurement of dimensions, and review of on-site working conditions and plans.

  • Step 5: Processing, pre-assembly simulation and factory inspection

    Production is carried out in accordance with national standards, with pre-installation simulation in the factory, trial use and testing, and leaving the factory after passing the inspection.

  • Step 6: Monitor the arrival of goods. Inspection and feedback

    Monitor the arrival, inspection and feedback in a timely and accurate manner. Contact the user for installation only after the goods are complete.

  • Step 7: Dispatch workers to assist and cooperate with the user

    Confirm the on-site working conditions and the readiness of self-provided conditions, confirm the installation time, and coordinate with each service door to make adequate preparations.

  • Step 8: On-site installation service scope

    Make a budget for the on-site installation schedule, provide technical briefings for installation, standardize construction and ensure proper connection of workstations (the user is responsible for the self-provided parts by themselves).

  • Step 9: Use the prompts and hand over to the acceptance

    Explain the key points of usage and maintenance, hand over the user manual and warranty certificate, and conduct acceptance and handover.

Our company strictly adheres to the
national product inspection and execution standards

Sanitary ceramics comply with the national standard: GB/T6952 -- 1999
The water tank accessories comply with the industry standard: JC/ T707-1997
The toilet seat cover complies with the industry standard: JC/T7647-2001
Ceramic disc sealed faucets comply with the national standard: GB/ T18145-2000
Bathroom hangers comply with the national standard: GB/ T101255-97
Bathroom appliances comply with the industry standard: GB-4706-15-2003
Bathroom sensor execution standard: CJ/T3081-1999
The glass fiber reinforced plastic bathtub complies with the industry standard: JC/ T779-2000
Shower room compliance standard: QB2584-2003
Steam room compliance standard: QB2584 -- 2003
The standard for bathroom furniture (bathroom cabinets) is: QPZD2004
Shower screen execution standard: QB/T2563-2002
The standard for the water-jet massage bathtub is: QB2584-2003
Note: In case of quality disputes or differences, the above standards shall be used for adjudication